Environmentally sensitive clearance of 50 years overgrowth on 23km stretch of disused railway lineThe Project This involved the initial stages of transforming the old railway from Midleton to Youghal (23km) into a Greenway. Around...
Bioengineering in Delphi to rehabilitate eroding riverbank and enhance salmonid habitatThe Project Due to a combination of environmental factors, a riverbank along the Glenummera River channel, approximately 1km upstream of...
Environmental specialists providing advice to the main contractor of the Bandon Flood Relief SchemeThe Project Frequency of flooding within Bandon town increased due to changes in land management practises in the upper catchment over a...
Restoring fish passage in Aughrim with a series of weirs with low flow notches downstreamThe Project Coatesbridge Weir, located on the Aughrim River in Co. Wicklow, was originally built to back up river flows in order to...
Creating improved instream habitat and enhancing salmon angling potential using a sub-surface stoneThe Project Changes within the River Blackwater catchment over an extended period of time have resulted in many and sometimes drastic...